® 2007 PRO-75 SERIES DIN rail single phase two wire energy meter 1.1 Safety instruction 1.2 Foreword 1.3 Performance criteria 1.4
® 2007 1.11 Technical support For questions about one of our products, please contact: - DMMetering dealer in your in your region - Your local DM
® 2007 1.1 Safety instructions Information for Your Own Safety This manual does not contain all of the safety measures for operation
® 2007 ? Make sure the protection cover is placed after installation. ? Installation, maintenance and reparations should only be done by qualified
® 2007 1.3 Performance criteria: Operating humidity = 75% Storage humidity = 95% Operating temperature
® 2007 Material Front panel PC inflammable retarding Cover ABS inflammable retarding Base ABS inflammable retar
® 2007 - We recommend that the connecting wire which is used to connect the meter to the outside circuit should be sized according
® 2007 1/2 Phase line IN/OUT 3/4 Neutral line IN/OUT 5 and 6 Test pulse output contact 1.
® 2007 Continue. Problem Check Solution No light for the Power supply indicator (Green LED). Is AC power supply conne
® 2007 Problem Check Solution No light for the consumption indicator (RED LED). Is the load
Commentaires sur ces manuels